Friday, July 10, 2015

Final Lift of Asphalt Paving Scheduled for Wednesday, July 15th

This past week, the contractor performed some miscellaneous tasks including replacing damaged driveways, final testing and inspections, preparation for sod, and other general work.

Next week, the contractor anticipates to begin sod restoration on Monday.

The final lift of asphalt pavement is currently scheduled for next Wednesday, July 15th. Cars will not be allowed to park on the street when the final layer of asphalt pavement is installed. Prior to the asphalt paving, a thin layer of oil will be installed over the previously installed asphalt pavement. “Fresh Oil” signs will be installed once the oil is placed. Please do not follow the truck as it is spraying the oil because it can spray on your car. After a few minutes, the oil will dry and you will be able to drive on it. We request that you drive slowly to prevent oil from getting on your car to the greatest extend possible.

Thanks again for all your cooperation.