Monday, June 22, 2015

Roadway Paving (First 2 Layers) Completed on Entire Project

Work Completed Last Week:
·         Dewes Street between Spruce Street and Lincoln Street
o   No work completed
  • Dewes Street between Lincoln Street and Harlem Avenue
    • Asphalt paving (first 2 layers)
    • Concrete sidewalk replacement
    • Asphalt driveway replacement
    • Replace detector loops at Dewes and Harlem
    • Landscape grading
    • Manhole adjustments
·         Elm Street between Dewes Street and Henley Street
o   No work completed
  • Henley Street between Elm Street and Spruce Street
    •  No work completed.
Work Anticipated This Week:
·         Dewes Street between Spruce Street and Lincoln Street
o   No work anticipated
  • Dewes Street between Lincoln Street and Harlem Avenue
    • Manhole Adjustments
    • Install and grade topsoil
    • General site clean-up
  • Elm Street between Dewes Street and Henley Street
    • No work anticipated
  • Henley Street between Elm Street and Spruce Street
    • No work anticipated. 
  • Landscaping
    • Complete miscellaneous landscaping items.
Thank you to all the residents along Henley Street, Dewes Street, Elm Street, and the surrounding areas throughout the 2014 and 2015 construction seasons. We understand a project of this size creates a lot of issues with accessing your driveways, dusty conditions, travel delays, water main shut downs, and overall disruptions to your daily lives. The major construction operations are coming to an end.  There are still a lot of minor issues that need to be addressed and construction on-going, but these should not create restrictions to your driveways or cause any significant inconveniences.