Miscellaneous Testing and Landscape Grading On-Going

Work Completed Last Week:
·         Dewes Street between Spruce Street and Lincoln Street
o   No work completed
  • Dewes Street between Lincoln Street and Harlem Avenue
    •  Completed replacement of detector loops at Dewes and Harlem
    • Landscape grading
  • Elm Street between Dewes Street and Henley Street
    • No work Complete
  • Henley Street between Elm Street and Spruce Street
    • No work completed.
Work Anticipated This Week:
·         Dewes Street between Spruce Street and Lincoln Street
o   No work anticipated
  • Dewes Street between Lincoln Street and Harlem Avenue
    • Install and grade topsoil
    • Install Sod
  • Elm Street between Dewes Street and Henley Street
    • No work anticipated
  • Henley Street between Elm Street and Spruce Street
    • No work anticipated. 
  • Landscaping
    • Complete miscellaneous landscaping items.
As you can tell from the decreased construction activity, the major construction items are now completed. The last section of roadway reconstruction along Dewes Street from Lincoln Street to Harlem Avenue was completed last week.

Several residents have asked when the final layer of asphalt pavement will be installed. With any major project, there are some minor repairs that need to be made along with testing/ inspections that need to be performed prior to finalizing the project. The landscape restoration along Dewes Street from Lincoln Street to Harlem Avenue also needs to be completed. At this time, the Village is waiting until all inspections are performed and accepted, needed repairs completed, and landscape restoration installed prior to paving the final lift of asphalt. This will hopefully eliminate the need to cut into the new pavement as well as keep the final surface from being damaged. The final lift of asphalt pavement is currently scheduled for mid-July.